OEM: Customer provides design

Design conversion stage
Technical docking meeting: Review 2D/3D drawings provided by customers and evaluate mold adaptability (±0.1mm accuracy).
DFM report output: Optimize structural design (such as rib layout, cable bending radius ≥8D).

Engineering verification stage
First sample production: CNC rapid sample (3-5 working days) for functional verification.
Design freeze: Sign the "Engineering Change Confirmation" to lock the technical specifications.